Terms of Service

Last updated: July 2026

1. Acceptance of Terms

By downloading, accessing, or using Builders Calculator ("the App"), you agree to be bound by these Terms of Service. If you do not agree, please do not use the App.

2. Use of the App

The App provides construction and financial calculators, reference diagrams, and an AI-powered building code assistant for general informational purposes only. Calculation results and AI responses are estimates and should not be relied upon as professional engineering, legal, or building advice. Always verify results with a qualified professional and applicable local codes before use in real projects.

3. Subscriptions

Some features are available only with a paid Pro subscription, billed through the app store or Stripe as applicable. Subscriptions renew automatically unless cancelled prior to the renewal date, in accordance with the billing platform's policies.

4. User Content

Any diary entries, photos, plans, or notes you create remain yours. You are responsible for the accuracy and legality of content you upload or store within the App.

5. Limitation of Liability

The App is provided "as is" without warranties of any kind. We are not liable for any damages or losses arising from reliance on calculations, diagrams, or AI-generated content produced by the App.

6. Changes to These Terms

We may update these Terms from time to time. Continued use of the App after changes constitutes acceptance of the updated Terms.

7. Contact

If you have questions about these Terms, please contact us through the support channel listed on the app store listing.

How to Record Mid Pour Quantities on Site

How to Record Mid Pour Quantities on Site

A concrete pour rarely runs exactly to the original take-off. A thickened edge, a low excavation, a changed set-down point or a few extra wheelbarrows to a repair area can shift the final number quickly. Knowing how to record mid pour quantities gives the site team a usable checkpoint before the last truck leaves, rather than a disputed total at the end of the day.

For builders, concreters and supervisors, the purpose is not to create more paperwork. It is to keep a clear record of what has arrived, what has been placed and what is still likely to be required. That record supports practical decisions during the pour, then remains available if the quantity is questioned later.

Why a mid-pour record matters

The batch docket tells you what the supplier dispatched. It does not always explain where every cubic metre went, whether the original measure allowed enough for site conditions, or why the placed quantity differs from the estimate. A mid-pour entry bridges that gap while the information is still visible on site.

This matters most on pours where volume is hard to judge from the plan alone: stepped slabs, footings with variable depth, suspended work with thickened zones, pools, retaining walls, ramps and patchy excavation conditions. It also matters when separate areas are being poured from the same delivery sequence. If the crew changes from footings to a slab edge midway through, the remaining concrete is no longer a simple guess.

A record taken at the halfway point gives the supervisor time to act. They can check the planned allowance, confirm the next load, reduce avoidable over-ordering or identify a possible shortfall before the crew is waiting on concrete. It also provides a defensible site note if the delivery total ends up above the quoted quantity.

Start with the right reference quantity

Before recording anything mid pour, establish what number you are checking against. This should be the approved planned quantity for the specific pour, not a broad project allowance or a number recalled from a conversation.

Use the drawing take-off, revised pour plan or calculated site measure. Where conditions have changed since estimating, note the revised basis. For example, a strip footing may have been allowed at 300 mm deep, but excavation inspection may show portions averaging closer to 380 mm. The planned quantity is still useful, but the record needs to state why actual use may move.

Keep the unit consistent. Concrete is normally tracked in cubic metres, but site dimensions may be measured in millimetres or metres. If an area is 85 m² and the average slab depth is 0.125 m, the base volume is 10.625 m³. Any thickened beams, rebates, pump priming, washout allowance or separately placed work should be calculated and identified rather than buried in a round figure.

A small allowance for normal site loss can be reasonable. The right allowance depends on the job, access, placement method and geometry. It should not be used to hide an uncertain measure. If the site measure is uncertain, record that uncertainty and recheck it.

What to record mid pour quantities against

A useful mid-pour record compares three figures: concrete delivered, concrete placed or allocated, and expected concrete remaining. These figures do different jobs.

Delivered quantity comes from the batch dockets. Enter each truck’s load and docket number as it arrives or discharges. Do not wait until the end of the pour, when dockets may be wet, misplaced or mixed with other paperwork.

Placed quantity is the best practical estimate of the work completed. On a simple slab, it may be the completed area multiplied by the confirmed average thickness. On complex work, it may be better to allocate known delivery loads to completed sections. For instance, if two 6 m³ loads have finished a footing run and a pump hopper has retained a small amount, record 12 m³ delivered and state the work area completed rather than claiming an overly precise placed volume.

Expected remaining quantity is the decision-making figure. Subtract the quantity assigned to completed work from the revised planned total, then compare it with concrete still on site and scheduled deliveries. This is a working forecast, not a final reconciliation.

Use a repeatable site entry

The record must be quick enough to complete while the pour is active. It should also be clear enough for someone who was not on site to understand it later. Capture the date, project, pour location, crew lead and weather conditions, particularly if rain, heat or delays affect placement.

Then record the planned quantity, the measuring basis and each delivery received to that point. Include the time of the checkpoint, work completed, any change to the pour sequence, and a short note on waste, rejected concrete, pump residue or concrete diverted to another approved area.

A practical entry might read:

> 10:45 am. Ground slab, rear dwelling. Planned quantity 28.4 m³ based on 198 m² at 125 mm, including 3.7 m³ for thickened perimeter and internal beams. Delivered to checkpoint: 18.0 m³ across dockets 2146, 2147 and 2148. Approximately 122 m² placed, including western thickened edge. Excavation at southern corner deeper than plan by an estimated 0.4 m³. Forecast remaining requirement: 10.8 to 11.5 m³. One 6 m³ load confirmed, final load to be reviewed after eastern bay.

That note is specific without pretending conditions are more exact than they are. It identifies the calculation basis, ties delivered concrete to dockets and records the reason for a potential variation.

Check the number at a meaningful point

A mid-pour check should happen after enough work has been completed to make the comparison useful. For a slab, that may be after the first major bay or at roughly half the planned volume. For footings, it may be after a complete run. For a multi-stage pour, use a checkpoint at the end of each defined section.

Checking too early can mislead because pump lines, hopper contents and the initial placement sequence distort the picture. Checking only at the end removes the chance to manage the outcome. The best point depends on the job, but it should be planned before concrete starts moving.

Where the pour has a high risk of variation, use more than one check. Deep excavations, irregular forms and renovation work often justify an early confirmation, a middle check and a final docket reconciliation. A short entry at each point is more reliable than one detailed note written from memory after clean-up.

Separate variation from ordinary waste

Not every difference between the take-off and delivery total is a variation. Small losses through pump lines, over-excavation at isolated points, minor spillage and practical finishing requirements can occur. The key is to identify the cause while it can be checked.

If the excavation was deeper, record the location and measured depth where possible. If additional concrete went into an item outside the original pour scope, name that item. If the supplier delivered a short or excess load, retain the docket details and note the observed issue. Avoid vague comments such as “used extra concrete”. They do not help with cost control, supplier discussions or client records.

There is also a trade-off between speed and detail. The person managing the pump cannot stop for a long form entry during a critical placement. In that case, a concise phone note or calculator diary entry at the checkpoint is enough, provided it is completed with docket details before the crew leaves site.

Keep dockets, calculations and notes together

Paper dockets are still common, but loose paperwork is a weak system. A docket in a ute console cannot help the office when a cost query arrives that afternoon. Nor can it explain the calculation used to order the concrete.

A central calculation history and diary make the record more useful. Builders Calculator can retain the original quantity calculation alongside the mid-pour note, so the planned measure, delivery information and site observations are not separated across scraps of paper, photos and messages. The value is continuity: the next person can see what was calculated, what changed and why.

For the best result, enter the checkpoint while the crew, dockets and completed work are in front of you. Add a final entry once the last truck is discharged, recording total delivered quantity, any returned concrete and the final area or element completed. If the final total differs materially from the plan, state the reason plainly and retain the supporting dimensions or site observation.

Make the record useful after the pour

Mid-pour records are often needed days or weeks later, when the job has moved on and memories have not. Write them for that future moment. A project manager should be able to open the entry and understand the concrete quantity without ringing the concreter. An estimator should be able to see whether the original take-off was sound. A builder should be able to respond to a supplier, client or subcontractor query with facts rather than recollection.

Use the same naming convention each time: project, level or area, element and date. “Smith St - Unit 2 - ground slab - 14 May” is far more useful than “concrete today”. Where a pour is split across days, make that clear in the entry rather than combining all quantities into one unclear total.

The strongest site records are not the longest ones. They are made at the right time, tied to the right quantities and clear about what changed. Record the midpoint while the pour is still in motion, and the final reconciliation becomes a straightforward check instead of a reconstruction.